New Cabinets

KraftMaid cabinetry in the layout your kitchen should have had all along, fitted by our own installers in about a week.

Get Your Free Estimate

Google

5.0

Google reviews

5.0

Angi reviews

New stained shaker cabinetry with a tall pantry and a quartz topped island

When the layout needs to change, or the boxes have had their day, new cabinetry gives you back the storage and the workflow.

How a cabinet replacement runs

We start by sitting down with you to understand how you use your kitchen, what you need to store, what you want it to look like, and what you want to spend. We take measurements and photographs, then design a kitchen around those answers rather than around a standard template.

At the design review we go through cabinetry, countertops, hardware and under cabinet lighting together. Once the choices are settled and the contract is signed, materials are ordered, and installation usually falls within about eight weeks.

Our own installers do the fitting, and most kitchens are complete in about a week. Whether you are after something urban and contemporary, cottage charm, an eclectic mix or a traditional classic look, the cabinetry is specified to suit the room and the house it sits in.

1

Design consultation

We measure, photograph and talk through storage, layout and budget before a single drawing is made.

2

KraftMaid cabinetry

Choose doors, finishes and hardware from our showroom, with samples in your hand rather than on a screen.

3

Ordered in about eight weeks

Materials are ordered once you approve the design, with installation typically scheduled within eight weeks.

4

About a week on site

Most kitchens are installed in around a week by our own crews, never by subcontractors.

How we work for you

From the first free estimate to the last adjustment, you know what is happening, what it costs, and who is in your home.

STEP 01

Free In-Home Estimate

We come to you, measure the room, and talk through how you actually use your kitchen. No charge and no obligation.

STEP 02

Design At Our Showroom

See KraftMaid and refaced doors, Cambria and Radianz quartz, and hardware in person while we refine the plan

STEP 03

A Firm Written Price

Your contract covers cabinetry, countertops, hardware and lighting. Nothing is ordered until you approve it

STEP 04

Our Crews Install

Refacing takes two to three days. Most full kitchens are finished in about a week by our own employees

Why homeowners call us first

Free estimates, no money down, and a limited lifetime warranty that transfers with your home. Nothing is ordered until you have approved the price in writing.

New stained cabinetry and a quartz-topped island installed by Pioneer Kitchens

1978

Family Owned Since

Free Written Estimates

We measure, design and price the job before you commit a dollar, with no money down and no pressure.

Our Own Installers

Your kitchen is fitted by Pioneer Kitchens employees, never subcontractors, on crews led by installers with 20+ years on the job.

Warranty That Transfers

Every installation carries a limited lifetime warranty that passes to the next owner of your home.

Get Your Free Estimate

Question? Answered

The things Indianapolis homeowners ask us most, from cost and timing to who actually does the work.

We handle the whole kitchen, from the first drawing to the last adjustment. We measure your space, talk through cabinetry, countertops, layout and features, then design the kitchen at our showroom where you can see the materials in person. Once the design is settled and the contract signed, we fabricate and install it with our own experienced crews.

A countertop replacement usually takes one or two days. Cabinet refacing runs from two days to about a week. A complete kitchen renovation generally takes one to three weeks on site, depending on how much is changing and which materials you have chosen. Cabinetry is typically ordered about eight weeks ahead of installation.

Cost depends entirely on the size of the kitchen and the materials you pick, which is why we come to your home to measure and design before quoting anything. The estimate is free, the price is agreed in a written contract before work starts, and there is no money down.

If your cabinet boxes are sound and the layout works, refacing gives you a new kitchen in two to three days at roughly half the cost of a full remodel. If you want a different layout, more storage, or your boxes have seen better days, new cabinetry is the better investment. We will tell you honestly which one your kitchen calls for.

Compare more than the bottom line. Check that the products quoted are genuinely equivalent, read what each warranty actually covers, ask who does the installing and whether they are employees or subcontractors, and ask for references. Be cautious of vague line items and of anyone pricing a kitchen by the square foot.

Still have questions?Read all FAQ’s

Ready to talk about your kitchen?

We will come out, measure the room, and give you a written price. Free, and with no obligation.

Get Your Free Estimate

FAMILY OWNED & OPERATED SINCE 1978

ANGIE'S LIST SUPER SERVICE AWARD SINCE 1999

LIMITED LIFETIME WARRANTY